Contracted with GS Engineering & Construction Corp. for LG MMA Plant
writer : admin (ckcadmin) date : 2006-08-22 11:59:53 hit:9531
CKC was contracted with GS E&C for LG MMA Plant, which is to supply agreement of the Esterification Reactor.
IP Address : 210.105.228.47
 
 
Process Refrigeration System | Gas Dehydration System | Vapor Recovery System | Natural Gas Liquids Recovery System | Nitrogen Rejection from Natural Gas | Carbon Dioxide Removal from Natural Gas | Waste heat Refrigeration Using Absorption Chilling | Carbon Adsorption | Desalination of Brine | Brine Polishing Filtration | Shell & Tube Heat Exchanger | Pressure vessel | Automatic Filter Systems | Cartridge Filters | Metallic Filter Cartridges | Auto Strainers | Dust Collectors | Sample Coolers | Simulated Moving Bed Separation System | Selective Catalytic Reduction | SCR System Marine Engine | VOC Catalytic Incineration System | English | Sitemap